Are things starting to dry out? Have you treated for bacteria and mold and the studs are getting to below 20% in moisture content (you really need a meter to know!)? Well then it may be time to start rebuilding. Here is a basic outline of how the process works in Nashville:
- Home Owner or Contractor pulls building permit
- Arrange for a licensed electrician to do the needed repairs.
- Minimum needed is the change of outlets that were submersed by water.
- Arrange for licensed HVAC and Plumbing contractors if repairs are needed.
- Once rough in inspections have been completed for electrical, HVAC and plumbing:
- Ensure all penetrations in the floor and wall plates have been fire caulked.
- Seal up under tub drain pipe.
- Fix or make any framing changes.
- Call in for framing inspection
- Insulate
- Install sheetrock or paneling
- Tape & texture sheetrock (If funds are available, we recommend that this be down by a professional finisher.)
- Prime new sheetrock.
- Install finish floors
- Install kitchen cabinets or bathroom cabinets
- Install base board and window trim
- Paint walls (This can be done before item 10, but if you do it at that point make sure you use flat paint for touch ups.)
- Call contractors in for trim out on electrical, HVAC and plumbing.
- Once final inspections have been completed for item #14 call in for final inspection.